Today I went to see the curtain & interior designer to get the quotation and booked the installation date. I really hope I can get all the curtains ready by this week so that I do not have to couch on other people's home. Same as before I have to walk all the way up to PV because there are no buses that pass along JMU. The pregnant lady was very nice and offered to drive me to PV and have the measurement straight away. And she even offered to send me all the way down to the station.
I was a bit down before (extremely down indeed) but now I am satisfied with my "performance" hehehe. I managed to get the curtain thingy half way done. Probably will get the fabrics on weekends and have to find a stool so that I can put the curtains up. In addition I am thinking about getting the bathrooms lights installed. In order to make PV livable I need to have iron, iron board and clothes dryer.
If only I can go back and get my things to PV on weekends, I will be very happy. It is going to be easier since I do not have to go to KL and wandering around town doing nothing. I can sleep, eat, surf the internet and do whatever I like in the house.
I know that the process of getting a house ready for living consume a lot of time, energy and effort. I have to have the highest level of patience and shut my mouth up. I know it is not easy since I do not have the money.
Subscribe to:
Post Comments (Atom)
0 comments on "More Work"
Post a Comment